Typical project scenario
Commercial Mold Remediation
Restoration · Greater Houston
A Houston commercial office suite had a post-pipe-burst Level 3 mold remediation. HireAVac supplied a HEPA vacuum used inside containment for the verified-clean pass that allowed third-party clearance to pass on the first attempt.
Challenge
The remediation contractor had built the Level 3 containment, removed contaminated drywall and insulation, and was 24 hours from the scheduled third-party Indoor Environmental Professional (IEP) clearance. Their existing HEPA vacuum had failed a pre-clearance filter test — the IEP wouldn't sign off with that unit on site.
Solution
HireAVac delivered a freshly-filtered Dirt Eater Protector with a current H13 certificate within 4 hours of the call. The contractor's crew did the final HEPA pass on all surfaces inside containment that evening, and the IEP arrived next morning.
Results
- IEP clearance
- Passed first attempt
- Schedule impact
- Zero — clearance on planned date
- Filter cert
- Current, accepted by IEP
- Re-mobilization avoided
- ~$6,200 saved
Note: This is a typical project scenario, not a specific named customer. Verified customer case studies are labeled and only published with documented permission.